Close Menu
Invest Insider News
    Facebook X (Twitter) Instagram
    Tuesday, July 15
    Facebook X (Twitter) Instagram Pinterest Vimeo
    Invest Insider News
    • Home
    • Bitcoin
    • Commodities
    • Finance
    • Investing
    • Property
    • Stock Market
    • Utilities
    Invest Insider News
    Home»Property»LBRUT opposes Teddington River Abstraction plans
    Property

    LBRUT opposes Teddington River Abstraction plans

    July 16, 20243 Mins Read


    The London Borough of Richmond upon Thames has not accepted plans to change the design for the Thames Waters Teddington Direct River Abstraction (TDRA) project.

    The proposed changes to the pipeline’s construction mean Thames Water can decrease the number of shafts and construction areas, reducing the surface-level impact on local communities.

    Tunnel boring instead of pipejacking would allow the company to take a more direct route to the River Thames, making the tunnel shorter.

    As a result, the following four locations for a shaft and construction compound would be removed from the project:

    • Shaft 1 at Ivybridge Retail Park Car Park.
    • Shaft 2 at Moormead & Bandy Recreation Ground.
    • Shaft 4 is on land adjacent to the playground off Riverside Drive.
    • Shaft 6 at Ham Lands, to the west of Riverside Drive.

    A single intermediate shaft is still required—the preferred location is off Ham Street. Two options also remain under investigation for the Thames Lee Tunnel Connection.

     Despite welcome reductions in the number of shafts required in Thames Water’s TDRA project, LBRUT remains firm in its opposition to the scheme, not least due to water quality concerns and the continued impacts of what is still a range of significant construction sites on valuable open spaces within the borough. 

    Councillor Gareth Roberts, leader of the council, said: 

    “Following the outcry from local residents, councillors and MPs, Thames Water have been forced to change their controversial plans, but as a council we remain hugely concerned about the impact both on the river itself and in Ham.

    “Thames Water need to do far more to convince residents that this scheme represents the best solution to predicted future water shortages. Until they do that, we will continue to oppose any scheme that we believe could harm the river and our land.” 

    Thames Water’s plan involves taking water from the River Thames at Teddington Weir, diverting it to the Lee Valley Reservoirs, and replacing it with waste water from Mogden Sewage Treatment Works. 

    Thames Water have made several key changes to their original proposal, including:

    • Changing the design of the pipeline that would transfer the treated waste water from Mogden to the Thames  
    • Changing the construction method for the pipeline from a pipejacking method to a tunnel-boring method
    • Changing the way they propose to extract material from the tunnel during construction 

    The amended proposal involves reducing the number of shafts and construction areas in the borough, which would alleviate some of the disruption to Richmond residents and open spaces if the proposals proceeded. 

    You can find out more about the changes on the Thames Water website.

     

    © London West (powered by ukpropertyforums.com).

    Sign up to receive our weekly free journal, The Forum here.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleKraken Secures 48,641 Bitcoin From Mt. Gox, What Comes Next?
    Next Article Is Trump Good For Bitcoin? Analysts Say So Despite Past ‘Scam’ Stance

    Related Posts

    Property

    Presidio Property Trust conclut une offre directe de 2,05 millions de dollars

    July 14, 2025
    Property

    Property boost as country houses over £750k selling once again | UK | News

    July 14, 2025
    Property

    Yuexiu Property conclut un accord de prêt à terme de 1,45 milliard HK$

    July 14, 2025
    Leave A Reply Cancel Reply

    Top Posts

    How is the UK Commercial Property Market Performing?

    December 31, 2000

    How much are they in different states across the US?

    December 31, 2000

    A Guide To Becoming A Property Developer

    December 31, 2000
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Bitcoin

    Le PDG de Bitwise réagit à l’avertissement de Musk: «Bitcoin n’a jamais été aussi important»

    May 25, 2025
    Stock Market

    US Stock Futures Slump, Asian Stocks Routed Amid Recession Fears

    August 5, 2024
    Bitcoin

    Bitcoin Price Watch: Bitcoin peut-il maintenir ce rallye ou est-il un recul?

    May 24, 2025
    What's Hot

    Finance genevoise: attention à l’épée de Damoclès

    March 2, 2025

    First Property Group prévoit un bénéfice avant impôts supérieur aux prévisions du marché pour l’exercice

    April 22, 2025

    Inflation is cooling overall, but not for seniors

    July 11, 2024
    Most Popular

    Definition, How It Works, and Legal Rights

    November 28, 2023

    Utilities Commission Holds Hearing On Renewable Energy Rules

    August 28, 2024

    Government to enforce detailed labelling on all retail packaged commodities, irrespective of weight | India News

    July 15, 2024
    Editor's Picks

    L’économiste Alex Krüger décrit trois catalyseurs haussiers pour Bitcoin, dit que la prochaine étude de BTC sera «explosive»

    July 4, 2025

    Tech stocks, bitcoin above $60k, Powell under fire: 3 things

    August 9, 2024

    Bitcoin Prix Prediction en juin 2025 – Bulls près de récupérer un niveau clé avant New Ath?

    June 7, 2025
    Facebook X (Twitter) Instagram Pinterest Vimeo
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions
    © 2025 Invest Insider News

    Type above and press Enter to search. Press Esc to cancel.