Close Menu
Invest Insider News
    Facebook X (Twitter) Instagram
    Wednesday, July 22
    Facebook X (Twitter) Instagram Pinterest Vimeo
    Invest Insider News
    • Home
    • Bitcoin
    • Commodities
    • Finance
    • Investing
    • Property
    • Stock Market
    • Utilities
    Invest Insider News
    Home»Utilities»Barhale wins approval for further HS2 utilities work at Euston
    Utilities

    Barhale wins approval for further HS2 utilities work at Euston

    September 10, 20252 Mins Read


    Barhale has secured a further package of utility works at HS2’s London Euston terminus, extending its role under construction partner Mace Dragados.

    The civils and tunnelling contractor will build new infrastructure around the southern section of the site, forming part of a multi-utility corridor set to link with existing services after looping around the western edge of Euston station.

    The contract includes design and build of 210 metres of 1,000mm diameter and 360 metres of 250mm diameter fresh water diversions, as well as 220 metres of 1,500mm diameter foul water sewer diversion. It also covers 190 metres of 800mm gas main, 180 metres of high-voltage cable, and 90 metres of communications lines.

    Several minor diversions of secondary services are also included.

    The scope builds on enabling works already completed around the north of the station and is part of a wider utilities strategy for the Euston site. Barhale is also carrying out enabling works along Hampstead Road, Cardington Street and Cumberland Market, including the Southern Tie-in.

    Senior contracts manager Mike Faherty said Barhale faced “exceptionally complex” challenges in the southern leg of the works, including crossing Euston Road with a 1,000mm water main while maintaining traffic access.

    He added that the team would draw on knowledge gained from the earlier phases and long-standing relationships with Thames Water, Cadent and London Underground.

    Design work is due to start in summer 2025, with construction expected to begin by March 2026 and complete in early 2029.

    Barhale was appointed directly by Mace Dragados, HS2’s station construction partner at Euston. The client for the project is High Speed Two Ltd.

    Source: Barhale press release



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleStock market today: Gift Nifty up 77 pts; levels to watch for Nifty, Sensex & Nifty Bank
    Next Article Bitcoin Has Not Yet Hit Seller ‘Exhaustion’

    Related Posts

    Utilities

    United Utilities apologises after Ambleside without drinking water for more than 12 hours

    July 16, 2026
    Utilities

    Costain wins three-year United Utilities contract extension

    July 15, 2026
    Utilities

    Backing to accelerate growth at utilities and infrastructure software platform

    July 14, 2026
    Leave A Reply Cancel Reply

    Top Posts

    How is the UK Commercial Property Market Performing?

    December 31, 2000

    How much are they in different states across the US?

    December 31, 2000

    A Guide To Becoming A Property Developer

    December 31, 2000
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Property

    Personal Lines Results Propel Turnaround in US Property/Casualty Industry’s 2024 Underwriting Performance

    June 26, 2025
    Property

    Corporate bond defaults disappear from China’s onshore market

    June 14, 2025
    Bitcoin

    Why Trump’s bitcoin ETF plans likely collapsed before even getting off the ground

    May 20, 2026
    What's Hot

    ‘Asia’s MicroStrategy’ Metaplanet secures ¥1 billion loan to acquire additional Bitcoin

    August 8, 2024

    3 Overlooked U.S. Value Stocks With the Fundamentals to Outperform in 2026

    March 13, 2026

    Essential Utilities Second Quarter 2025 Earnings: Beats Expectations

    August 2, 2025
    Most Popular

    Property Market Turning? UK House Prices Slip as Mortgage Pressure Builds, Bank of England Holds Rates High

    June 15, 2026

    Iris Energy (IREN) Is Poised to Become One of the Biggest Listed Bitcoin Miners With AI, HPC Optionality: Canaccord

    July 24, 2024

    UK expects U.S. trade deal to hold By Investing.com

    February 23, 2026
    Editor's Picks

    Market hits records as unexpected profits are logged

    May 5, 2026

    Best AI Tools for Personal Finance Management in 2026

    December 18, 2025

    Vatican ‘let down’ by financier in London property deal, High Court says

    February 21, 2025
    Facebook X (Twitter) Instagram Pinterest Vimeo
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions
    © 2026 Invest Insider News

    Type above and press Enter to search. Press Esc to cancel.