Swedish fuel cell manufacturer PowerCell Group has won a SEK 440 million (€39 million) contract to supply a utility-scale hydrogen power generation installation for an electric cooperative in the southern US.
The agreement, signed through the company’s US subsidiary, will see the deployment of a 27MW fuel cell installation capable of delivering 20MW of rated power. The solution is based on ‘s containerised PowerPod 3000 platform. Project delivery is expected over 18-24 months.
The installation will form part of an integrated renewable energy system designed to address the intermittency of solar power. Excess electricity generated by the customer’s solar assets will be used to produce green hydrogen, which can then be stored for longer periods and converted back into electricity when required.
Using proton exchange membrane (PEM) fuel cell technology, the system will provide dispatchable power during the night, when solar generation is unavailable, or during periods of reduced renewable output and increased electricity demand.
Smarter solar
By allowing surplus solar electricity to be stored and used beyond the hours of generation, the project aims to improve the usage of existing assets while providing a more flexible and reliable source of electricity.
The project will also generate water as part of the electrochemical conversion of hydrogen into electricity. This creates the potential to recover and reuse water within the wider energy system, potentially reducing its overall water requirements. The amount of water recovered and its potential uses will depend on the final system configuration, operating conditions and water treatment requirements.
Also of interest
PowerCell will supply and integrate the fuel cell power generation installation within its agreed scope, converting green hydrogen from the customer’s energy storage system into electricity. The parties also intend to enter into a dedicated service level agreement prior to commissioning.
A major move
Richard Berkling, CEO of PowerCell Group, said: “This order represents an important step in establishing power generation as our second major segment alongside marine. It demonstrates how our industrialised PEM technology, system integration and energy orchestration capabilities can create value at utility scale.”
