Close Menu
Invest Insider News
    Facebook X (Twitter) Instagram
    Wednesday, June 10
    Facebook X (Twitter) Instagram Pinterest Vimeo
    Invest Insider News
    • Home
    • Bitcoin
    • Commodities
    • Finance
    • Investing
    • Property
    • Stock Market
    • Utilities
    Invest Insider News
    Home»Utilities»Salem utilities officials talk wastewater treatment plant project progress | News, Sports, Jobs
    Utilities

    Salem utilities officials talk wastewater treatment plant project progress | News, Sports, Jobs

    March 23, 20254 Mins Read


    SALEM — The utilities commission discussed the rate of progress for phase three improvements at the wastewater treatment plant in its meeting Thursday.

    Burgess and Niple Contract Administrator Don Tych said that the trickling filter station has been renovated with new pipes and valves, and that the new pumps were ready to be set in place. Progress is also continuing in the sludge dewatering and sludge conditioning building. He said that the conveyor system in the sludge dewatering building had been roughed in and were “98% complete,” process piping in the sludge conditioning building was about 50% complete, waste gas piping for the anaerobic digestor had been completed and tested, and the primary tank roof inspection had been completed.

    Tych also said that they were working to test the secondary and primary tanks and making changes to the anaerobic digestor building, noting that material sourcing was proving to be problematic and that “parts and pieces” for the project were on back order causing delays.

    “What we’re trying to do is get the secondary and primary tank full of water … so we can test the tanks and float them better to make sure they are going to sit evenly and work in tandem … before we can start transferring anything into it, in the meantime we have a couple of piping changes in the basement of the digestor building,” said Tych. “They’re minor changes we want to get done before putting anything online, they’re basically just a couple of extra valves and recirculation lines to be sure they can move everything around between the piping down there … they’re in the process of doing it, between that and getting some materials. Procuring materials seem to be the worst thing, when you think it’s a shelf item it’s not.”

    Commission Chair Bob Hodgson said that he had visited the plant and was concerned if the renovations, except for the switch gear, would be completed before the April 8 deadline as the extension granted by the state was only for the gear.

    “We’ve still got the April 8 drop dead date for everything except the switch gear, and with the amount of stuff that’s still sitting on the floor I’ve got a real fear that we’re not gonna meet that date,” said Hodgson. “The letter from the attorney general was crystal clear, the only thing we were given the extension on was the switch gear, it did not alter any of the other parts of the [consent] decree. There’s a lot of stuff sitting out there that needs put together.”

    Hodgson said that it needed to be ensured that “everything other than that switch gear is operational on April 8,” and that there was still “20 valves and connections sitting in” the sludge conditioning building. Hodgson also asked Tych to have Project Manager Bob Schreiner call Utilities Superintendent Butch Donnalley and Assistant Superintendent Chad Hess Friday morning.

    Tych said that those valves hadn’t been installed yet because Project Contractor Stanley Miller has been unable to get the necessary hangars. Hodgson said that the commissioners, Donnalley and Hess needed to be kept appraised of these issues so they can contact the attorney general’s office about delays.

    “We’ve got to be on top of this. We have a very specific timeline to notify the attorney general’s office once we discover we have a supply issue and we need to comply with that,” said Hodgson.

    The utilities commission will meet next at 3 p.m. April 17.

    LISBON — The jury trial for a Wellsville man accused of attempted murder and other charges for severely beating a …

    YELLOW CREEK TOWNSHIP (WKBN) – The Ohio State Highway Patrol is investigating a deadly car crash that happened …

    COLUMBUS, Ohio — The Ohio Department of Commerce Division of State Fire Marshal has awarded approximately $2.52 …

    SALEM — The utilities commission discussed the rate of progress for phase three improvements at the wastewater …

    LISBON — William Devon, superintendent, Columbiana County Board of Developmental Disabilities (CCBDD), told the …



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleEn pleine chute, faut-il encore miser sur le bitcoin ?
    Next Article Augmentation du bénéfice attribuable de Jinmao Property Services en 2024 ; les actions perdent 6%. -Le 24 mars 2025 à 06:53

    Related Posts

    Utilities

    Utilities Up on Rotation Out of Tech – Utilities Roundup

    June 9, 2026
    Utilities

    What Utilities Need to Know About the 900-MHz ‘NextNav’ FCC Proceeding

    June 8, 2026
    Utilities

    What Is the Vanguard Utilities ETF, and Who Should Buy It?

    June 5, 2026
    Leave A Reply Cancel Reply

    Top Posts

    How is the UK Commercial Property Market Performing?

    December 31, 2000

    How much are they in different states across the US?

    December 31, 2000

    A Guide To Becoming A Property Developer

    December 31, 2000
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Property

    Aussie agent reveals culture shock over US real estate trust

    November 30, 2025
    Commodities

    FG begins nationwide distribution of N2.9 billion maternal and neonatal health commodities 

    September 8, 2025
    Bitcoin

    Strategy’s BTC Holdings Flip Red as Bitcoin Crashes to as Low as $75,500

    January 31, 2026
    What's Hot

    Bitcoin News Today: Morgan Stanley BTC ETF Sets Firm Record With $30.6M First-Day Inflows

    April 13, 2026

    US-Iran Peace Talks Stall Ahead of Trump-Xi Meeting, Will Bitcoin Crash?

    May 11, 2026

    Consultiv Utilities to sponsor organisation founded by Jason Manford

    January 22, 2026
    Most Popular

    As XAU outperforms BTC in Q3, What to expect in Q4?

    October 3, 2025

    Strategy acquires $1.28 billion BTC as corporate treasuries near 5% of Bitcoin supply

    March 9, 2026

    Stock Market Highlights Today: BSE Sensex, Nifty50 end in red; RBI keeps repo rate unchanged at 5.25%, announces measures for foreign capital

    June 5, 2026
    Editor's Picks

    Will The Bitcoin Bull Run Return?

    August 22, 2024

    Bitcoin Is Aiming For The Moon In 2025 And Nothing Seems To Be Able To Stop It!

    October 13, 2024

    China enhances credit financing services for small businesses

    April 2, 2025
    Facebook X (Twitter) Instagram Pinterest Vimeo
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions
    © 2026 Invest Insider News

    Type above and press Enter to search. Press Esc to cancel.