Close Menu
Invest Insider News
    Facebook X (Twitter) Instagram
    Monday, May 18
    Facebook X (Twitter) Instagram Pinterest Vimeo
    Invest Insider News
    • Home
    • Bitcoin
    • Commodities
    • Finance
    • Investing
    • Property
    • Stock Market
    • Utilities
    Invest Insider News
    Home»Utilities»EHV Tower Failures: Govt Asks Utilities for Maintenance: Rediff Moneynews
    Utilities

    EHV Tower Failures: Govt Asks Utilities for Maintenance: Rediff Moneynews

    October 21, 20254 Mins Read


    Govt directs utilities like Adani & NTPC to maintain EHV transmission towers after 75 failures. Climate change & wind are factors.

    New Delhi, Oct 21 (PTI) A government committee has directed transmission utilities, including those owned by the Adani Group and state-owned NTPC, to carry out proper maintenance as 75 extra high voltage (EHV) transmission line towers failed between the January-June period of 2025.

    As per the minutes of the meeting of the committee, a change in the wind intensity in certain parts of the country on account of climate change has been observed as one of the key reasons for the failure of the EHV transmission line towers, which play a crucial role in the transportation of large amounts of power over long distances.

    A total of 75 EHV transmission line towers in 22 transmission lines failed between January and June 2025 or H1, owing to a number of reasons that need to be checked and timely reported by the utilities.

    These assets are owned by 12 players, including Adani Transmission, ReNew Transmission Ventures, Resonia Limited (erstwhile Sterlite Power Transmission Ltd), Powergrid and NTPC, said the report by the Standing Committee of Experts constituted by the Central Electricity Authority (CEA).

    As per the report, the main cause of tower failures is attributed to high-intensity wind as reported by the transmission utilities. The wind intensity has changed in certain parts of the country due to climate change. However, the utilities failed to produce wind data in many cases of EHV transmission line tower failures, which could substantiate their reasoning.

    Other reasons for failure of EHV line towers include damage to the foundation, tower structure and deformation in the legs of towers and the cage portion of the bottom cross arm level.

    To avoid such incidents, the CEA has advised the utilities to refer to the wind map provided in the National Building Code for the design of towers till the revised wind map has been included in IS 875. SERC, in coordination with IMD, has been requested to update the wind map.

    It said transmission utilities need to take proactive measures like increased line patrolling and immediate replacement of missing members/bolts. Various deficiencies, such as missing members, missing bolts, bent members, incorrect attachment of cross arm, chimney covered with soil, and rusted stubs/members, have been observed during the failure site visit of various transmission towers of different utilities.

    Utilities should take necessary precautions and carry out proper maintenance of their lines to avoid failure of towers due to such deficiencies, it added.

    The transmission towers erected near river banks should be frequently patrolled, and an assessment based on history should be made to anticipate the change in the course of the river, and necessary protection should be provided to towers to avoid their damage during such an incident.

    For towers located in overlapping wind zones, the Committee recommended that the higher wind zone shall be considered if the tower is situated within 50 km of the border area, and the tower may be designed accordingly.

    It has also recommended that the utilities develop in-house teams equipped with relevant tower design software to simulate, analyse, and address design issues in failed towers.

    The CEA committee has also advised that the digitisation of spares and inventory management of transmission system assets using suitable software like SAP shall be taken up on a priority basis.

    Utilities are also asked to submit the actual wind velocity prevailing in the affected area so that the investigating team of the Standing Committee can get the reference wind speed that prevailed over that area. In this matter, the respective utility may seek the help of IMD/ nearest Airport/ nearest wind farms, or the State Irrigation Department to estimate the wind speed in the affected area based on data obtained from observatory/ Satellite/Radar.

    Utilities should furnish a closure report for the event within 3 months, including all the details and records. All utilities are requested to adhere to these timelines strictly, it noted.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleRachel Reeves is coming for YOUR pensions, property and savings: How she could bring in a wealth tax by the back door
    Next Article Bitcoin XRP $15B Seizure Market Crisis: Bitcoin and XRP facing collapse? Could the $15 billion government seizure trigger a crypto crisis? How this unprecedented action threatens market trust, safety, and investor confidence

    Related Posts

    Utilities

    Addressing underground threats to vital infrastructure – How modern ground strengthening solutions minimise disruption to utilities

    May 17, 2026
    Utilities

    Narberth Swimming Pool gets £1k from Wales & West Utilities

    May 14, 2026
    Utilities

    The Hidden Bottleneck Slowing DER Interconnection—and What Utilities Can Do About It

    May 13, 2026
    Leave A Reply Cancel Reply

    Top Posts

    How is the UK Commercial Property Market Performing?

    December 31, 2000

    How much are they in different states across the US?

    December 31, 2000

    A Guide To Becoming A Property Developer

    December 31, 2000
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Property

    Sale of school property delayed

    July 23, 2024
    Property

    Property boost as country houses over £750k selling once again | UK | News

    July 14, 2025
    Finance

    Asia-Pacific Climate Report 2024: Catalyzing Finance and Policy Solutions – World

    October 31, 2024
    What's Hot

    Binance Founder CZ Predicts Bitcoin Will Flip Gold in Market Cap

    October 20, 2025

    Crude Oil Markets Face a Paper Vs. Physical Divide as Supplies Tighten

    April 28, 2026

    Le Bitcoin bat un nouveau record avant l’investiture de Trump

    January 20, 2025
    Most Popular

    Kevin Warsh or Kevin Hassett? Inside the Fed Chair Contest

    December 17, 2025

    North Kitsap home attracts dozens of hungry raccoons

    October 8, 2024

    Michael Saylor Hints at Strategy’s Next Bitcoin Purchase

    January 18, 2026
    Editor's Picks

    China Hatches Plan to Keep U.S. Military From Getting Its Rare-Earth Magnets — Commodities Roundup

    November 11, 2025

    Pathways to Banking and Finance: Years 12-13

    August 13, 2020

    Less power from coal, more from natural gas in Kentucky’s future, says state’s largest utility • Kentucky Lantern

    October 25, 2024
    Facebook X (Twitter) Instagram Pinterest Vimeo
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions
    © 2026 Invest Insider News

    Type above and press Enter to search. Press Esc to cancel.