Close Menu
Invest Insider News
    Facebook X (Twitter) Instagram
    Monday, May 4
    Facebook X (Twitter) Instagram Pinterest Vimeo
    Invest Insider News
    • Home
    • Bitcoin
    • Commodities
    • Finance
    • Investing
    • Property
    • Stock Market
    • Utilities
    Invest Insider News
    Home»Property»LBRUT opposes Teddington River Abstraction plans
    Property

    LBRUT opposes Teddington River Abstraction plans

    July 16, 20243 Mins Read


    The London Borough of Richmond upon Thames has not accepted plans to change the design for the Thames Waters Teddington Direct River Abstraction (TDRA) project.

    The proposed changes to the pipeline’s construction mean Thames Water can decrease the number of shafts and construction areas, reducing the surface-level impact on local communities.

    Tunnel boring instead of pipejacking would allow the company to take a more direct route to the River Thames, making the tunnel shorter.

    As a result, the following four locations for a shaft and construction compound would be removed from the project:

    • Shaft 1 at Ivybridge Retail Park Car Park.
    • Shaft 2 at Moormead & Bandy Recreation Ground.
    • Shaft 4 is on land adjacent to the playground off Riverside Drive.
    • Shaft 6 at Ham Lands, to the west of Riverside Drive.

    A single intermediate shaft is still required—the preferred location is off Ham Street. Two options also remain under investigation for the Thames Lee Tunnel Connection.

     Despite welcome reductions in the number of shafts required in Thames Water’s TDRA project, LBRUT remains firm in its opposition to the scheme, not least due to water quality concerns and the continued impacts of what is still a range of significant construction sites on valuable open spaces within the borough. 

    Councillor Gareth Roberts, leader of the council, said: 

    “Following the outcry from local residents, councillors and MPs, Thames Water have been forced to change their controversial plans, but as a council we remain hugely concerned about the impact both on the river itself and in Ham.

    “Thames Water need to do far more to convince residents that this scheme represents the best solution to predicted future water shortages. Until they do that, we will continue to oppose any scheme that we believe could harm the river and our land.” 

    Thames Water’s plan involves taking water from the River Thames at Teddington Weir, diverting it to the Lee Valley Reservoirs, and replacing it with waste water from Mogden Sewage Treatment Works. 

    Thames Water have made several key changes to their original proposal, including:

    • Changing the design of the pipeline that would transfer the treated waste water from Mogden to the Thames  
    • Changing the construction method for the pipeline from a pipejacking method to a tunnel-boring method
    • Changing the way they propose to extract material from the tunnel during construction 

    The amended proposal involves reducing the number of shafts and construction areas in the borough, which would alleviate some of the disruption to Richmond residents and open spaces if the proposals proceeded. 

    You can find out more about the changes on the Thames Water website.

     

    © London West (powered by ukpropertyforums.com).

    Sign up to receive our weekly free journal, The Forum here.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleKraken Secures 48,641 Bitcoin From Mt. Gox, What Comes Next?
    Next Article Is Trump Good For Bitcoin? Analysts Say So Despite Past ‘Scam’ Stance

    Related Posts

    Property

    Alicante top holiday home destination for UK buyers

    May 3, 2026
    Property

    House prices nearly double UK average in West Oxfordshire

    May 3, 2026
    Property

    St Helens – Ryan Little property consultancy launches

    May 1, 2026
    Leave A Reply Cancel Reply

    Top Posts

    How is the UK Commercial Property Market Performing?

    December 31, 2000

    How much are they in different states across the US?

    December 31, 2000

    A Guide To Becoming A Property Developer

    December 31, 2000
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Bitcoin

    We Asked AI to Pick the Best Crypto to Buy Right Now: XRP, Bitcoin, or Solana?

    March 24, 2026
    Property

    India, US ink Cultural Property Agreement for repatriation of stolen antiquities – Firstpost

    July 26, 2024
    Property

    U.S. House Prices Rise 5.7 Percent over the Last Year; Up 0.9 Percent from the First Quarter of 2024

    August 27, 2024
    What's Hot

    Derivatives house of the year: Bank of America

    May 16, 2024

    Dow dips, S&P 500 and Nasdaq rebound on Strait of Hormuz hopes

    April 2, 2026

    Strategy (MSTR) Stock Jumps 7% as STRC Volume Suggests 1,000 Bitcoin Acquisition

    March 4, 2026
    Most Popular

    European stocks rise amid hopes for progress in U.S.-Iran talks By Investing.com

    April 14, 2026

    Second edition of Bitcoin MENA Conference kicks off in Abu Dhabi

    December 8, 2025

    Les principales cryptomonnaies reculent : le Bitcoin passe sous la barre des 107 000 $

    June 27, 2025
    Editor's Picks

    UK government borrowing costs jump, sterling rallies as Britain and EU agree to reset relations – NBC 5 Dallas-Fort Worth

    May 18, 2025

    Musk launches poll asking if Tesla should invest $5 billion in xAI, early votes in favour By Reuters

    July 24, 2024

    How exposed are iron ore prices to higher energy costs? By Investing.com

    March 21, 2026
    Facebook X (Twitter) Instagram Pinterest Vimeo
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions
    © 2026 Invest Insider News

    Type above and press Enter to search. Press Esc to cancel.